
AI-generated illustration; the color shown is an example.
- Freight is calculated at checkout from your ZIP code.
- Lead time confirmed at order.
- Order to your building's drawings.
Secondary framing
Eave strut
A cut-to-length eave strut ordered to the size and gauge on your building drawings.
Pricing coming soon
Online ordering opens soon. Questions about a part? Contact us.
About this part
The eave strut runs along the top of each side wall, where the roof meets the wall. It is the top girt and the first purlin in one member, with its top flange sloped to match the roof pitch.
Tell us the depth, gauge, roof pitch and length from your drawings. The pitch matters: an eave strut for a 1:12 roof will not sit right on a 4:12 roof.
Your building's engineering documents govern sizes, gauges, spacing and connections. We supply parts to match them; we do not give engineering advice.
Options
| Depth and gauge | 8 inch | 14 gauge, 8 inch | 16 gauge, 10 inch | 14 gauge, 12 inch | 14 gauge |
|---|---|
| Cut length | Any length from 4 ft to 36 ft |
| Roof pitch on my building drawings | 1:12, 2:12, 3:12, 4:12, 5:12, 6:12, 7:12, 8:12, 9:12, 10:12, 11:12, 12:12 |
| Matches my building's drawings | Yes - these match my building's drawings |
| Sold | per linear foot |



