- AG panel
- An agricultural metal panel with low ribs, common on barns, sheds and carports. It covers 36 inches per sheet and does not lap onto PBR.
- Anchor bolt
- A bolt cast into the concrete foundation that holds a column down. Its size, grade and placement come from the foundation drawings.
B
- Bare (aluminum-zinc coated)
- A coating of aluminum and zinc on steel. Unpainted Bare (aluminum-zinc coated) is the bare silver finish; painted panels start from coated steel too.
- Base angle
- An L-shaped member fastened to the slab along the bottom of a wall. The bottoms of the wall panels screw to it. Base channel does the same job with a C shape. See base angle
- Base trim
- The flashing along the bottom of a wall that covers the panel ends and sheds water away from the slab. See base trim
- Bay
- The space between two main frames. A building with five main frames has four bays.
- Butyl tape
- A sticky sealant strip that never fully dries, laid in panel laps and under trim and closures. Also called tape mastic. See butyl tape sealant
C
- C purlin
- A purlin or girt with a C-shaped section: a flat back and two flanges with lips. Also called C-channel or C-section. See 8-inch cee purlin
- C-channel building
- A steel building framed with cold-formed C-shaped members instead of welded I-beam frames. Common for smaller buildings.
- Cable bracing
- Steel cables run in an X across a wall or roof bay. The size and location come from the building's engineering documents.
- Clip
- A small steel plate on the main frame that a purlin, girt or eave strut bolts to.
- Closure
- A foam strip shaped like the panel ribs that fills the gaps at the panel ends. Inside closures sit under the panel; outside closures sit on top, under a trim. See foam closure strips for pbr and r-panel
- Coverage width
- How wide one panel is once it is lapped with the next. PBR and AG panels cover 36 inches.
- Cut length
- The finished length of one panel or member. Panels and framing are cut to the inch for each order.
D
- Downspout
- The pipe that carries water from the gutter down to the ground. Elbows turn it at the top and bottom. See downspout
- Drip edge
- A small trim with a hooked lip that throws water clear of the surface below it.
E
- Eave
- The lower, level edge of the roof, along the top of the side walls.
- Eave strut
- The member along the top of each side wall where roof meets wall: the top girt and the first purlin in one, with its top flange sloped to the roof pitch. See eave strut
- Eave trim
- The trim that closes the roof edge along the eave. A gutter often takes its place. See eave trim
- End wall
- The wall at each end of the building, under the sloped roof edges. On a gable building it rises to a peak. Also called the gable wall.
- Exposed-fastener panel
- A panel fastened with screws through its face into the framing, such as PBR and AG. Standing seam panels hide their fasteners instead.
F
- Flange brace
- A short angle from a purlin or girt to the inside flange of a main frame. The drawings mark where each one goes.
- Framed opening
- The steel around a door or window: two jambs up the sides and a header across the top.
G
- Gauge
- A number for steel thickness. The lower the number, the thicker the steel: 24 gauge is thicker than 26, and 26 is thicker than 29.
- Girt
- A horizontal member on the wall that the wall panels screw to. Girts come in Z and C shapes.
H
- Head trim
- The trim across the top of a door or window opening, shaped to turn water out over the opening. See head or sill trim
- Hillside washer
- A beveled washer that lets a brace rod pass through a frame web at an angle and still sit flat under the nut.
I
- I-beam rigid frame
- The main frame of a pre-engineered steel building: columns and rafters built from I-shaped steel members and bolted together.
J
- Jamb trim
- The trim down each side of a door or window opening, covering the cut panel edges. See jamb trim
L
- Lap
- Where one panel overlaps the next. A side lap runs along the long edge; an end lap is where one sheet overlaps the end of another.
- Liner panel
- A light panel on the inside face of the girts or purlins that protects the insulation and gives a washable interior.
P
- PBR panel
- Purlin bearing rib panel: the most common exposed-fastener roof and wall panel on steel buildings. It covers 36 inches per sheet and has an extra purlin bearing leg on one edge for a wider side lap. See 26-gauge pbr panel
- Pitch
- How steep a roof is, written as rise per 12 inches of run. A 1:12 roof rises 1 inch for every 12 inches across.
- Purlin
- A roof member that runs from frame to frame and carries the roof panels. Most are Z-shaped so they can lap at each frame. See 8-inch zee purlin
R
- Rake
- The sloped edge of the roof at each end wall.
- Rake trim
- The trim along the rake that covers the roof panel edge and the top of the end wall panels. See rake trim
- Ridge cap
- The trim over the peak of the roof where the two slopes meet. See standard-pitch ridge cap
- Rod bracing
- Solid steel rods, threaded at the ends, run in an X across a bay. The size and location come from the engineering documents.
- Roll-up door
- A door that coils into a drum above the opening. Sold by the width and height of the finished opening.
S
- Sag rod
- A threaded rod between purlins or girts that keeps them in line while the panels go on.
- Self-drilling screw
- A screw with a drill point that drills its own hole through steel. Panel screws carry a sealing washer under a painted head.
- Side wall
- The long walls of the building, under the eaves.
- Skylight panel
- A translucent panel shaped like a steel panel, used in place of one sheet to let daylight in. Never step on one.
- Standing seam
- A roof panel with raised seams that hide its fasteners. Clips under the seams hold it to the purlins.
- Stitch screw
- A short screw that fastens steel to steel: panel side laps, trim to panels and trim to trim. See stitch screws (lap screws) for panel side laps and trim
T
- Transition trim
- Trim that seals the joint where a roof meets a wall or another roof, such as a lean-to tie-in. See rake transition trim
V
- Vapor barrier
- The facing laminated to metal building insulation that keeps moist inside air away from the cold steel.
W
- Wainscot
- A band of panels along the bottom of a wall in a second color, capped with a trim where the colors meet.
- Walk door
- A personnel door, pre-hung in a steel frame. A 3070 door is 3 ft 0 in wide and 7 ft 0 in tall.
Z
- Z purlin
- A purlin with a Z-shaped section. One Z can nest over the next at a frame, which is how continuous purlin lines are built. See 8-inch zee purlin